Best-Selling Cable Tray Tee - HC1-MR Hesheng Perforated Middle Reducer – Hesheng
Best-Selling Cable Tray Tee - HC1-MR Hesheng Perforated Middle Reducer – Hesheng Detail:
Product description
Hesheng solid and perforated bottom cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
Cable management is a key consideration for optimizing system reliability, effective space utilization and scalability. Hesheng group offer industry, leading cable tray systems as part of comprehensive, integrated Data center solutions to effectively manage and protect high-performance communication, computing and power cables.
Cable tray- is a safe and economical solution for supporting requirements of electric power, signal, control, instrumentation and communication cables. Fabricated in numerous styles (wire mesh, ladder, ventilated trough, channel, and solid-bottom) and sizes, cable tray provides the greatest versatility among cable support systems, while offering savings of up to 84 percent in labor costs.
Moreover,H.S. also develop various accessories for our range which are used for support & installation of cables over the cable trays.
H.S.offer a wide range of components of perforated cable trays.Middle Reducer is one of the components,used as reducer connector.
These perforated cable trays are offered in different materials , generally fabricated in mild steel, Pre-galvanized, Hot-dip Galvanized,Stainless Steel,Aluminium,Fiber Reinforced Plastic, Plain Steel with powder coated.
The accessories are mentioned below:
·Fitings
·Clamps
·Supports
Advantages:
·Corrosion Resistance
·Easy-installing
·Durability
Product Specifications
Oerdering Code |
W1(mm) |
W2(mm) |
H(mm) |
|
HC1-MR |
HC1-MR-100-50 |
100 |
50 |
50 |
HC1-MR-150-50 |
150 |
50 |
50 |
|
HC1-MR-200-50 |
200 |
50 |
50 |
|
HC1-MR-150-100 |
150 |
100 |
50 |
|
HC1-MR-200-100 |
200 |
100 |
50 |
|
HC1-MR-250-100 |
250 |
100 |
50 |
|
HC1-MR-200-150 |
200 |
150 |
50 |
|
HC1-MR-300-150 |
300 |
150 |
50 |
Schematic diagram of the Cable Tray space layout
Production Process
Production line for Metal Cable Tray Here is processing line of cable tray and welcome to visit our plant
Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements
Installation case on site for Hesheng cable support system
Installation cases on site for cable tray with holes, metal cable ladder,metal cable trunking,wire mesh cable tray,wireway, cable channel,solid bottom cabletray, polymer alloy cable tray,which can be applied in the
Product application program
Actual Test on Site
Certificate
Installation case on site for perforated cable tray HC1
Product detail pictures:
Related Product Guide:
Quality First,and Customer Supreme is our guideline to provide the best service to our customers.Nowadays, we are trying our best to become one of the best exporters in our field to meet customers more need for Best-Selling Cable Tray Tee - HC1-MR Hesheng Perforated Middle Reducer – Hesheng , The product will supply to all over the world, such as: Greek, Dubai, Slovak Republic, We also have good cooperation relationships with many good manufacturers so that we can provide almost all of auto parts and after-sales service with high quality standard,lower price level and warmly service to meet demands of customers from different fields and different area.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
Suffix | Finish | Suffix | Finish | Suffix | Finish |
G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
S6 | Stainless steel SS06 | F | Fire rated |
By Poppy from Sheffield - 2018.09.21 11:01
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Jill from United Kingdom - 2017.12.31 14:53