Big Discount Engineering Cable Tray - HC1-C Hesheng Perforated Four-Way Cross – Hesheng
Big Discount Engineering Cable Tray - HC1-C Hesheng Perforated Four-Way Cross – Hesheng Detail:
Product description
Hesheng solid and perforated bottom cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
perforated cable tray allows for hold down or cable attachment, and heat dissipation.
The continuous perforated cable tray allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray, Cable Trunking, Cable Ladder, Wireway, Strut Channel and accessories, which can be widely used in construction, energy, electricity, plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Every piece of our perforated cable tray has an average length of 3000 mm, other length available against the requirements of the customers.
Moreover,H.S. also develop various accessories for our range which are used for support & installation of cables over the cable trays, supplying a wide assortment of Horizontal or vertical Cross Perforated Cable Tray.Provided cross cable tray is installed in communication sectors and various commercial units for joining corners of optical fiber cables and wires.
The accessories are mentioned below:
·Fitings
·Clamps
·Supports
Advantages:
·Corrosion Resistance
·Easy-installing
·Durability
Installation Guide for Cross of Hesheng Perforated Cable Tray
Product Specifications
Oerdering Code |
W(mm) |
H(mm) |
|
HC1-C |
HC1-C-50-50 |
50 |
50 |
HC1-C-100-50 |
100 |
50 |
|
HC1-C-150-50 |
150 |
50 |
|
HC1-C-200-50 |
200 |
50 |
|
HC1-C-250-50 |
250 |
50 |
|
HC1-C-300-50 |
300 |
50 |
|
HC1-C-400-50 |
400 |
50 |
|
HC1-C-450-50 |
450 |
50 |
|
HC1-C-500-50 |
500 |
50 |
|
HC1-C-600-50 |
600 |
50 |
Schematic diagram of the Cable Tray space layout
Production Process
Production line for Metal Cable Tray Here is processing line of cable tray and welcome to visit our plant
Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements
Installation case on site for Hesheng cable support system
Installation cases on site for cable tray with holes, metal cable ladder,metal cable trunking,wire mesh cable tray,wireway, cable channel,solid bottom cabletray, polymer alloy cable tray,which can be applied in the
Product application program
Actual Test on Site
Certificate
Installation case on site for perforated cable tray HC1
Product detail pictures:

Related Product Guide:
As for competitive charges, we believe that you will be searching far and wide for anything that can beat us. We will state with absolute certainty that for such excellent at such charges we have been the lowest around for Big Discount Engineering Cable Tray - HC1-C Hesheng Perforated Four-Way Cross – Hesheng , The product will supply to all over the world, such as: Gabon, Norway, Denver, We hope we can establish long-term cooperation with all of the customers, and hope we can improve competitiveness and achieve the win-win situation together with the customers. We sincerely welcome the customers from all over the world to contact us for anything you need to have!Welcome all customers both at home and abroad to visit our factory. We hope to have win-win business relationships with you, and create a better tomorrow.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
Suffix | Finish | Suffix | Finish | Suffix | Finish |
G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
S6 | Stainless steel SS06 | F | Fire rated |

The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
