Massive Selection for Data Center Construction - HABB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Angle Bar Bracket – Hesheng
Massive Selection for Data Center Construction - HABB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Angle Bar Bracket – Hesheng Detail:
Product description
Angle Bar Bracket
Hesheng cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
The continuous Hesheng cable supporting system allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray with holes , solid pan bottom cable tray, Cable Trunking, Cable Ladder, Wireway, wiremesh cable tray,Strut Channel,Conduit and accessories, which can be widely used in construction, energy, electricity and plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Every straight piece of our perforated cable tray has an average length of 3000 mm, other length available against the requirements of the customers.
Moreover,H.S. also develop various accessories for our range which are used for support & installation of cables over the cable trays.
H.S.offer a wide range of components of perforated cable trays. Angle bar bracket is one of the components .These fittings are generally fabricated in mild steel.
The accessories are mentioned below:
·Fitings
·Clamps
·Supports
Advantages:
·Corrosion Resistance
·Easy-installing
·Durability
Basic Information

Product Specifications


Strut Channel and Fittings

Production Process
Production line for Metal Cable Tray Here is processing line of cable support system and welcome to visit our plant

Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements

Installation case on site for Hesheng cable support system

Product application program

Actual Test on Site

Certificate

Product detail pictures:
Related Product Guide:
We have state-of-the-art equipment. Our products are exported for the USA, the UK and so on, enjoying a fantastic status among the clients for Massive Selection for Data Center Construction - HABB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Angle Bar Bracket – Hesheng , The product will supply to all over the world, such as: Somalia, Sevilla, Plymouth, Providing Quality Products, Excellent Service, Competitive Prices and Prompt Delivery. Our products are selling well both in domestic and foreign markets. Our company is trying to be one important suppliers in China.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
| Suffix | Finish | Suffix | Finish | Suffix | Finish |
| G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
| H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
| S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
| S6 | Stainless steel SS06 | F | Fire rated |
It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.





