Massive Selection for Data Center Construction - HCC1Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Cover Clamp HCC1 – Hesheng
Massive Selection for Data Center Construction - HCC1Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Cover Clamp HCC1 – Hesheng Detail:
Product description
Cover Clamp H-CC1
Hesheng cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
The continuous Hesheng cable supporting system allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray with holes , solid pan bottom cable tray, Cable Trunking, Cable Ladder, Wireway, wiremesh cable tray, Strut Channel,Conduit and accessories, which can be widely used in construction, energy, electricity and plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Every straight piece of our perforated cable tray has an average length of 3000 mm, other length available against the requirements of the customers.
Moreover,H.S. also develops various accessories for our range which are used for support & installation of cables over the cable trays.
H.S.offer a wide range of components of perforated cable trays. Cover Clamp H-CC1 is one of the fittings . These fittings are generally fabricated in mild steel.
Standard finish of H.S. Strut Channel as below, customize available:
•G — Pre-galvanized steel
•H — Hot Dip Galvanized
•S4 — Stainless Steel SS304
•S6 — Stainless Steel SS316
•P — Powder Coated
•M — Mill/Plain Steel ,
• A —- Aluminium
•FRP – Fiberglass Reinforced Plastics I GRP
H.S. Strut Channel Advantages:
•100% Adjustable
•100% Reusable
•No Welding
•No Drilling
•No Special Tools Hesheng Strut Channel
Basic Information

Product Specifications


Strut Channel and Fittings

Production Process
Production line for Metal Cable Tray Here is processing line of cable support system and welcome to visit our plant

Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements

Installation case on site for Hesheng cable support system

Product application program

Actual Test on Site

Certificate

Product detail pictures:
Related Product Guide:
The incredibly abundant projects administration experiences and 1 to one provider model make the superior importance of small business communication and our easy understanding of your expectations for Massive Selection for Data Center Construction - HCC1Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Cover Clamp HCC1 – Hesheng , The product will supply to all over the world, such as: Madrid, Mongolia, Surabaya, Our items are widely recognized and trusted by users and can meet continuously changing economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
Standard finish of H.S.Perforated Cable Tray as below, customize available:
| Suffix | Finish | Suffix | Finish | Suffix | Finish |
| G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
| H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
| S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
| S6 | Stainless steel SS06 | F | Fire rated |
The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!


