Massive Selection for Data Center Construction - HISC Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Inside Straight Coupler – Hesheng
Massive Selection for Data Center Construction - HISC Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Inside Straight Coupler – Hesheng Detail:
Product description
Height Adjust Coupler
Hesheng cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
The continuous Hesheng cable supporting system allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray with holes , solid pan bottom cable tray, Cable Trunking, Cable Ladder, Wireway, wiremesh cable tray, Strut Channel, Conduit and accessories, which can be widely used in construction, energy, electricity and plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Every straight piece of our perforated cable tray has an average length of 3000 mm, other length available against the requirements of the customers.
Moreover,H.S. also develops various accessories for our range which are used for support & installation of cables over the cable trays.
H.S.offers a wide range of components of perforated cable trays. Height Adjust Coupler is one of the fittings . These fittings are generally fabricated in mild steel.
Standard finish of H.S. Strut Channel as below, customize available:
•G — Pre-galvanized steel
•H — Hot Dip Galvanized
•S4 — Stainless Steel SS304
•S6 — Stainless Steel SS316
•P — Powder Coated
•M — Mill/Plain Steel ,
•A — Aluminium
•FRP – Fiberglass Reinforced Plastics I GRP
H.S. Strut Channel Advantages:
•100% Adjustable
•100% Reusable
•No Welding
•No Drilling
•No Special Tools Hesheng Strut Channel
Basic Information
Product Specifications
Strut Channel and Fittings
Production Process
Production line for Metal Cable Tray Here is processing line of cable support system and welcome to visit our plant
Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements
Installation case on site for Hesheng cable support system
Product application program
Actual Test on Site
Certificate
Product detail pictures:
Related Product Guide:
We are convinced that with joint efforts, the business between us will bring us mutual benefits. We can assure you product quality and competitive price for Massive Selection for Data Center Construction - HISC Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Inside Straight Coupler – Hesheng , The product will supply to all over the world, such as: Mecca, kazan, Washington, Furthermore, all of our products are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our products, please don't hesitate to contact us. We will do our best to meet your needs.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
Suffix | Finish | Suffix | Finish | Suffix | Finish |
G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
S6 | Stainless steel SS06 | F | Fire rated |
By Delia Pesina from Algeria - 2018.06.03 10:17
High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
By Norma from Guinea - 2018.07.12 12:19