Massive Selection for Data Center Construction - HUFS Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Under Floor Stand – Hesheng
Massive Selection for Data Center Construction - HUFS Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Under Floor Stand – Hesheng Detail:
Product description
H-UFS Under Floor Stand
Hesheng cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
The continuous Hesheng cable supporting system allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray with holes , solid pan bottom cable tray, Cable Trunking, Cable Ladder, Wireway, wiremesh cable tray, Strut Channel, Conduit and accessories, which can be widely used in construction, energy, electricity and plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Moreover,H.S. also develops various accessories for our range which are used for support & installation of cables over the cable trays.
S.offers a wide range of components of perforated cable trays.H-UFS Under Floor Stand is generally attached to the ground and to support or fix the cable supporting system on the ground.
Standard finish of H.S. Strut Channel as below, customize available:
•G — Pre-galvanized steel
•H — Hot Dip Galvanized
•S4 — Stainless Steel SS304
•S6 — Stainless Steel SS316
•P — Powder Coated
•M— Mill/Plain Steel ,
•A — Aluminium
•FRP – Fiberglass Reinforced Plastics I GRP
H.S. Strut Channel Advantages:
•100% Adjustable
•100% Reusable
•No Welding
•No Drilling
•No Special Tools Hesheng Strut Channel
Basic Information

Product Specifications


Strut Channel and Fittings

Production Process
Production line for Metal Cable Tray Here is processing line of cable support system and welcome to visit our plant

Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements

Installation case on site for Hesheng cable support system

Product application program

Actual Test on Site

Certificate

Product detail pictures:
Related Product Guide:
It is our responsibility to meet your needs and efficiently serve you. Your satisfaction is our best reward. We are looking forward to your visit for joint growth for Massive Selection for Data Center Construction - HUFS Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Under Floor Stand – Hesheng , The product will supply to all over the world, such as: Frankfurt, Indonesia, US, We have been in operation for more than 10 years. We are dedicated to quality products and consumer support. We currently own 27 product utility and design patents. We invite you to visit our company for a personalized tour and advanced business guidance.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
| Suffix | Finish | Suffix | Finish | Suffix | Finish |
| G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
| H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
| S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
| S6 | Stainless steel SS06 | F | Fire rated |
Goods just received, we are very satisfied, a very good supplier, hope to make persistent efforts to do better.





