Massive Selection for Data Center Construction - HWB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Wall Bracket – Hesheng
Massive Selection for Data Center Construction - HWB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Wall Bracket – Hesheng Detail:
Product description
H-WB Wall Bracket
Hesheng cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
The continuous Hesheng cable supporting system allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray with holes , solid pan bottom cable tray, Cable Trunking, Cable Ladder, Wireway, wiremesh cable tray, Strut Channel, Conduit and accessories, which can be widely used in construction, energy, electricity and plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Moreover,H.S. also develops various accessories for our range which are used for support & installation of cables over the cable trays.
H.S.offers a wide range of components of perforated cable trays. Wall Bracket is one of the fittings . These fittings are generally fabricated in mild steel, which is attached to a wall and used to support or hold up cable supporting system.
I.
Standard finish of H.S. Strut Channel as below, customize available:
•G — Pre-galvanized steel
•H — Hot Dip Galvanized
•S4 — Stainless Steel SS304
•S6 — Stainless Steel SS316
•P — Powder Coated
•M— Mill/Plain Steel ,
•A — Aluminium
•FRP – Fiberglass Reinforced Plastics I GRP
H.S. Strut Channel Advantages:
•100% Adjustable
•100% Reusable
•No Welding
•No Drilling
•No Special Tools Hesheng Strut Channel
Basic Information

Product Specifications


Strut Channel and Fittings

Production Process
Production line for Metal Cable Tray Here is processing line of cable support system and welcome to visit our plant

Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements

Installation case on site for Hesheng cable support system

Product application program

Actual Test on Site

Certificate

Product detail pictures:
Related Product Guide:
We know that we only thrive if we can guarantee our combined price tag competiveness and top quality advantageous at the same time for Massive Selection for Data Center Construction - HWB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Wall Bracket – Hesheng , The product will supply to all over the world, such as: Sheffield, Jordan, Israel, Establish long term and win-win business relationships with all our customers, share the success and enjoy the happiness of spreading our products to the world together. Trust us and you will gain more. Please feel free to contact us for more information, we assure you of our best attention at all times.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
| Suffix | Finish | Suffix | Finish | Suffix | Finish |
| G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
| H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
| S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
| S6 | Stainless steel SS06 | F | Fire rated |
The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.





