Massive Selection for Data Center Construction - HWB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Wall Bracket – Hesheng
Massive Selection for Data Center Construction - HWB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Wall Bracket – Hesheng Detail:
Product description
H-WB Wall Bracket
Hesheng cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
The continuous Hesheng cable supporting system allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray with holes , solid pan bottom cable tray, Cable Trunking, Cable Ladder, Wireway, wiremesh cable tray, Strut Channel, Conduit and accessories, which can be widely used in construction, energy, electricity and plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Moreover,H.S. also develops various accessories for our range which are used for support & installation of cables over the cable trays.
H.S.offers a wide range of components of perforated cable trays. Wall Bracket is one of the fittings . These fittings are generally fabricated in mild steel, which is attached to a wall and used to support or hold up cable supporting system.
I.
Standard finish of H.S. Strut Channel as below, customize available:
•G — Pre-galvanized steel
•H — Hot Dip Galvanized
•S4 — Stainless Steel SS304
•S6 — Stainless Steel SS316
•P — Powder Coated
•M— Mill/Plain Steel ,
•A — Aluminium
•FRP – Fiberglass Reinforced Plastics I GRP
H.S. Strut Channel Advantages:
•100% Adjustable
•100% Reusable
•No Welding
•No Drilling
•No Special Tools Hesheng Strut Channel
Basic Information
Product Specifications
Strut Channel and Fittings
Production Process
Production line for Metal Cable Tray Here is processing line of cable support system and welcome to visit our plant
Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements
Installation case on site for Hesheng cable support system
Product application program
Actual Test on Site
Certificate
Product detail pictures:
Related Product Guide:
Our goal is usually to deliver high quality items at aggressive price ranges, and top-notch service to shoppers around the entire world. We're ISO9001, CE, and GS certified and strictly adhere to their high quality specifications for Massive Selection for Data Center Construction - HWB Hesheng Metal Stainless Steel Galvanized Steel Alumnium Alloy Wall Bracket – Hesheng , The product will supply to all over the world, such as: Angola, Muscat, Adelaide, Customer's satisfaction is always our quest, creating value for customers is always our duty, a long term mutual-beneficial business relationship is what we are doing for. We are an absolutely reliable partner for yourself in China. Of course, other services, like consulting, can be offered too.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
Suffix | Finish | Suffix | Finish | Suffix | Finish |
G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
S6 | Stainless steel SS06 | F | Fire rated |
By Maria from Israel - 2018.12.14 15:26
Timely delivery, strict implementation of the contract provisions of the goods, encountered special circumstances, but also actively cooperate, a trustworthy company!
By Lindsay from Malta - 2018.02.04 14:13