Massive Selection for Data Center Construction - Strengthening Bracket STNB2 – Hesheng
Massive Selection for Data Center Construction - Strengthening Bracket STNB2 – Hesheng Detail:
Product description
Strengthening Bracket STNB1
Hesheng cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
The continuous Hesheng cable supporting system allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray with holes , solid pan bottom cable tray, Cable Trunking, Cable Ladder, Wireway, wiremesh cable tray, Strut Channel, Conduit and accessories, which can be widely used in construction, energy, electricity and plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Moreover,H.S. also develops various accessories for our range which are used for support & installation of cables over the cable trays.
S.offers a wide range of components of perforated cable trays. Strengthening Bracket STNB2 is one of the fittings . These fittings are generally fabricated in mild steel, which is attached to a wall and used to support or hold up cable supporting system and is of larger supporting capacity than STNB1.
T.
Standard finish of H.S. Strut Channel as below, customize available:
•G — Pre-galvanized steel
•H — Hot Dip Galvanized
•S4 — Stainless Steel SS304
•S6 — Stainless Steel SS316
•P — Powder Coated
•M— Mill/Plain Steel ,
•A — Aluminium
•FRP – Fiberglass Reinforced Plastics I GRP
H.S. Strut Channel Advantages:
•100% Adjustable
•100% Reusable
•No Welding
•No Drilling
•No Special Tools Hesheng Strut Channel
Basic Information

Product Specifications


Strut Channel and Fittings

Production Process
Production line for Metal Cable Tray Here is processing line of cable support system and welcome to visit our plant

Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements

Installation case on site for Hesheng cable support system

Product application program

Actual Test on Site

Certificate

Product detail pictures:
Related Product Guide:
All we do is usually connected with our tenet " Consumer initial, Rely on 1st, devoting around the food stuff packaging and environmental safety for Massive Selection for Data Center Construction - Strengthening Bracket STNB2 – Hesheng , The product will supply to all over the world, such as: Belize, Salt Lake City, Moscow, Qualified R&D engineer might be there for your consultation service and we will try our best to meet your requirements. So you should feel free to contact us for inquiries. You'll be able to send us emails or call us for small business. Also you are able to come to our business by yourself to get further knowing of us. And we are going to surely present you with the best quotation and after-sale service. We're ready to build stable and friendly relations with our merchants. To achieve mutual success, we'll make our best efforts to build a solid co-operation and transparent communication work with our companions. Above all, we're here to welcome your inquiries for any of our merchandise and service.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
| Suffix | Finish | Suffix | Finish | Suffix | Finish |
| G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
| H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
| S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
| S6 | Stainless steel SS06 | F | Fire rated |
We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!





