Massive Selection for Data Center Construction - Strengthening Celling Bracket – Hesheng
Massive Selection for Data Center Construction - Strengthening Celling Bracket – Hesheng Detail:
Product description
H-CB Ceiling Bracket
Hesheng cable tray system is ideal solution for instrumentation cable and electrical cable runs in industrial or commercial cable management applications, helping eliminate the need for conduit or ladder.
The continuous Hesheng cable supporting system allows for constant cable support. Our products consist of Wire Mesh Cable Tray, Cable Tray with holes , solid pan bottom cable tray, Cable Trunking, Cable Ladder, Wireway, wiremesh cable tray, Strut Channel, Conduit and accessories, which can be widely used in construction, energy, electricity and plant. We passed the ISO 9001 quality management system certification, UL Certificate (U.S.A.), and CE Certificate (E.U.)
Moreover,H.S. also develops various accessories for our range which are used for support & installation of cables over the cable trays.
offers a wide range of components of perforated cable trays. H-SCB Strengthening Ceiling Bracket with much larger suspended load than H-CB is one of the fittings , which is attached to the ceiling and used to hang up cable supporting system .
Standard finish of H.S. Strut Channel as below, customize available:
•G — Pre-galvanized steel
•H — Hot Dip Galvanized
•S4 — Stainless Steel SS304
•S6 — Stainless Steel SS316
•P — Powder Coated
•M— Mill/Plain Steel ,
•A — Aluminium
•FRP – Fiberglass Reinforced Plastics I GRP
H.S. Strut Channel Advantages:
•100% Adjustable
•100% Reusable
•No Welding
•No Drilling
•No Special Tools Hesheng Strut Channel
Basic Information
Product Specifications
Strut Channel and Fittings
Production Process
Production line for Metal Cable Tray Here is processing line of cable support system and welcome to visit our plant
Packing and Delivery for Cable tray
Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements
Installation case on site for Hesheng cable support system
Product application program
Actual Test on Site
Certificate
Product detail pictures:
Related Product Guide:
We support our buyers with ideal high quality products and high level service. Becoming the specialist manufacturer in this sector, we have gained rich practical experience in producing and managing for Massive Selection for Data Center Construction - Strengthening Celling Bracket – Hesheng , The product will supply to all over the world, such as: Belgium, Switzerland, London, Our company has always insisted on the business principle of "Quality, Honest, and Customer First" by which we have won the trust of clients both from at home and abroad. If you are interested in our solutions, you should do not hesitate to contact us for further information.
Standard finish of H.S.Perforated Cable Tray as below, customize available:
Suffix | Finish | Suffix | Finish | Suffix | Finish |
G | Pre -galvanized/PG/GI | P | Powder coated | Z | Zinc plated |
H | Hot dip galvanized/HDG | A | Alumnium | E | Electrolytic polishing |
S4 | Stainless steel SS04 | FRP | Fiber reinforced plstic/GRP | M | Mill/Plain steel |
S6 | Stainless steel SS06 | F | Fire rated |
By Mamie from Anguilla - 2017.08.18 18:38
Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
By Annabelle from Angola - 2018.07.26 16:51