Polymer Alloy plastic (PVC )Vertical Right Top Elbow with the chemical structure of whisker modified

Short Description:

Cable supporting system consists of cable ladder, cable tray and cable channel.

According to the manufacturing materials, it is divided into metal bridge and plastic bridge, glass fiber reinforced plastic bridge etc. According to the structure, it is divided into cable ladder, cable tray, cable channel ,they each has its advantages and disadvantages: the ladder frame has good ventilation performance, but not dust-proof or interference, channel type has dust-proof, anti-interference, but the heat dissipation performance is poor. Cable tray is mainly used for exposed wiring in industrial and civil buildings. Each kind of cable supporting system is comprised of straight through parts, bends components , strut channel, connectors and fittings. Vertical Right Top Elbow is one of the components usually used on the right top.


Product Detail

Standard

Product Tags

Product description

Overview of PHQ- high strength whisker modified plastic cable tray

Polymer alloy cable tray for many consumers, a lot of basic information about the internal structure, use of materials, processing technology, working principle are not clear, it is necessary to understand. In particular, the matters needing attention during the installation need to be well understood, because the installation of polymer alloy cable tray is an important link. Let me explain one by one for you

1. Choose the right model, polymer alloy cable tray has a variety of models for different scenarios and uses, so the next step is to choose the right model;

2. Select experienced installation masters. The installation operation of polymer alloy cable tray is a highly professional work. It is recommended to select the original installation masters to ensure the installation effect and quality;

3. Select high-quality polymer alloy cable tray,Hesheng group as a professional manufacturer of polymer alloy cable tray, to provide you with high-quality and low-cost products.

The above is the installation precautions of polymer alloy cable tray. If you still don't understand, please contact us for more detailed answers.

Basic Information

specification
different

Product Specifications

product
Ordering Code Specification Center Line
B1 H1 L1 L2
PHQ-C-2J

PHQ-K-2J

PHQ-T-2J

50 50 470 400

500

100 50/100
200 100

150

200

630
300 730
400 830
500 930
600 1030
800 1230
1000 1430
1200 1630

Space layout of the Polymer Alloy Cable Supporting System

detail

Bends Components of the Polymer Alloy Cable Supporting System

system

Brackets and Fittings of Polymer Alloy Cable Supporting System

system

Why choose Hesheng polymer alloy cable tray?

why

Packing and Delivery for Cable tray

Packing Method:
1.In bundle
2.Wrapping Film,plastic tape, Plywood pallet.
3.Plywood Pallets is optional for wire basket cable tray
4.Carton for accessories
5.As per requirements

hc

Engineering cases on site

hc

Product application program

application

Certificate

certificate

FAQs

Q: Are you a factory or a trading company?
A:We not only have our own factories but also have shares in some other enterprises.

Q:What services you can offer?
A:We are manufacturer with a range of electrical and network cable tray systems , you can enjoy the one-stop shopping service from our company.Quality and cost driving manufacturer with ISO9001,CE,NEMA,UL,SGS certificated to provide customers reliable products with most competitive price.

Q:How can you make commitment passing the test?
A:We have professional lab to do below test:
a.safe loading test
b.galvanized thickness test
c.salt spray test
d.electrical continuity

Q:What is your products advantages:
A:
a.Reduce installation costs and time
b.Easy for changing, adding and moving
c.Bright surface means good material and quality
d.Our electrical and network cabling equipment have the same quality as the international famous brand.

Q: Can you provide samples?
A: Yes ,you can get the free samples.

Q: What is your payment terms?
A: 30% T/T deposit,balance will be paid before shipment or against the copy of B/L;

Q: How about the delivery time?
A: According to your order list and quantity,Normally delivery in 15-25days.

Q: Why do choose us?
A:
Cable Tray Official Certificates Worldwide
We has been certified by ISO9001 in China, UL in U.S.A and CE in E.U. with professional design and extremely well production techniques. These certifications are our first step into the International market.
Cable Tray Production Flow Strictly Managed
Our Factory has various types of CNC machines, high quality modeling machines, processing equipment, which provides the most powerful guarantee for high quality products.
Cable Tray Quality Traceability System Maintained
In order to serve high quality products, it is essential to test the manufactured products before delivery. In this session, Our factory develops the most stringent testing procedures, and trains factory inspectors besides its already high level product inspection equipment.

Actual Test on Site

test

  • Previous:
  • Next:

  • Standard finish of H.S.Perforated Cable Tray as below, customize available:

    Suffix Finish Suffix Finish Suffix Finish
    G Pre -galvanized/PG/GI P Powder coated Z Zinc plated
    H Hot dip galvanized/HDG A Alumnium E Electrolytic polishing
    S4 Stainless steel SS04 FRP Fiber reinforced plstic/GRP M Mill/Plain steel
    S6 Stainless steel SS06 F Fire rated
    Write your message here and send it to us
    -->